0:0050:08

How to Cut Product Development Costs by up to 50% by Nelly Yusupova

50:08 2022

The same project can cost $10,000 or $50,000, and both quotes can be fair

One founder says a better process would have saved his software startup close to half a million dollars over three years, even with a CTO and a tech team in place. A CTO who has managed tech teams for over 18 years, Nelly Yusupova argues that much of that waste begins before anyone writes code. Where exactly does the money leak, and which steps stop it?

Learn a 10-step process to validate, prototype, scope and ship features without wasted spend

Watch on YouTube

In short

Nelly Yusupova, a CTO and startup tech advisor, argues that founders and product leaders waste large sums by coding before they have validated, prototyped and properly scoped their ideas. She walks through four keys of her TechSpeak 10-step process (validation and prototyping, MVP planning, agile delivery and behavior analytics) and estimates what skipping each step costs per feature or release.

“The number one reason why products and new features for existing products fail to be adopted, it's not because they couldn't be built, but because no one wanted them in the first place.”
“Remember, it is always a lot cheaper to rapidly change prototypes than it is to rewrite code.”

What you will learn

  • Validate every product idea through hypothesis-driven, one-on-one customer interviews before building anything.
  • Test solutions with no-code clickable prototypes so you change designs instead of rewriting code.
  • Scope MVPs by how features are built, not only how many, and push back when developers or agencies overbuild.
  • Run agile sprints of two weeks or less to catch mistakes early and reshuffle the roadmap when the market shifts.
  • Use behavior analytics and the lifetime value versus acquisition cost comparison to fix retention before spending on marketing.

Details

Level
Beginner
Format
Talk
Technical depth
Introductory technical
For
Founder, People manager
Length
50:08
Published
June 2022

Questions this talk answers

Why is having a product development process not enough?

Because releasing code is different from releasing code effectively and efficiently. Teams not using lean and agile methods waste time and money through inefficiencies and miscommunication.

How does the lean way of building products differ from the classic way?

The classic way builds an idea in secret for months and only then gets feedback. The lean way treats every idea as a hypothesis and runs a fast hypothesis, test, learn, revise loop with customers.

How can the same project be estimated at $10,000 and $50,000?

The details of what and how you build matter a lot. Using cost-reducing strategies, one of Yusupova's students cut her MVP from $50,000 to $15,000 and halved development time.

Why use agile rather than waterfall project management?

Waterfall locks a big plan up front for three to six months or more, while agile splits work into sprints of two weeks or less. Mistakes surface early and future sprints can be reprioritized.

What is customer lifetime value and why does it matter?

It is the money a customer brings over the whole time they stay a customer. It tells you how much you can spend to acquire customers, and acquisition cost should stay below it.

Topics

Related talks

Browse the library

Partnering with your Product Team

Rawia Ashraf Vice President, Product - Legal Practice and Productivity, Thomson Reuters

Why your engineers belong in the room with your customers

Beginner Product and design 2021